{"id":9743,"date":"2018-06-29T18:42:12","date_gmt":"2018-06-29T20:42:12","guid":{"rendered":"http:\/\/www.cdlbc.com.br\/portal\/?p=9743"},"modified":"2018-06-29T21:30:32","modified_gmt":"2018-06-29T23:30:32","slug":"comite-da-bacia-hidrografica-do-rio-camboriu-defende-construcao-do-parque-inundavel-na-cdl","status":"publish","type":"post","link":"https:\/\/www.cdlbc.com.br\/portal\/noticias\/comite-da-bacia-hidrografica-do-rio-camboriu-defende-construcao-do-parque-inundavel-na-cdl\/","title":{"rendered":"COMIT\u00ca DA BACIA HIDROGR\u00c1FICA DO RIO CAMBORI\u00da DEFENDE CONSTRU\u00c7\u00c3O DO PARQUE INUND\u00c1VEL EM REUNI\u00c3O NA CDL"},"content":{"rendered":"<p>A diretoria do Comit\u00ea da Bacia Hidrogr\u00e1fica do Rio Cambori\u00fa defendeu hoje, dia 29 de julho, a import\u00e2ncia da cria\u00e7\u00e3o do Parque Inund\u00e1vel para garantir o abastecimento de \u00e1gua das cidades de Cambori\u00fa e Balne\u00e1rio Cambori\u00fa. O Parque Inund\u00e1vel multiuso tem com objetivo regularizar a vaz\u00e3o do Rio Cambori\u00fa e conter cheias nas \u00e1reas ribeirinhas. A defesa foi feita durante reuni\u00e3o convocada para discutir a situa\u00e7\u00e3o h\u00eddrica regional, realizada na C\u00e2mara de Dirigentes Lojistas (CDL) de Balne\u00e1rio Cambori\u00fa. A CDL vai oficiar as prefeituras das duas cidades beneficiadas com o parque de que \u00e9 favor\u00e1vel \u00e0 obra. A reuni\u00e3o contou com a participa\u00e7\u00e3o de representantes da \u00a0diretoria da CDL, \u00a0o presidente da AMPE, Nivaldo \u00c1vila dos Santos, o diretor executivo da Acibalc, Fernando Assinti,\u00a0 integrantes do F\u00f3rum Permanente da Sociedade Civil e da Comiss\u00e3o de Meio Ambiente da OAB-BC.<\/p>\n<p>A ideia do Parque Inund\u00e1vel foi sugerida pelo Comit\u00ea da Bacia Hidrogr\u00e1fica do Rio Cambori\u00fa como a solu\u00e7\u00e3o mais eficiente para os dois momentos extremos do Rio Cambori\u00fa: estiagem e cheia. Al\u00e9m de aumentar a disponibilidade h\u00eddrica e deter as vaz\u00f5es de cheias, o projeto tamb\u00e9m ser\u00e1 um espa\u00e7o para uso recreativo e de conserva\u00e7\u00e3o ambiental dessa \u00e1rea.<\/p>\n<p>Segundo o\u00a0 professor da Univali e doutor em Ci\u00eancias Naturais,\u00a0 Paulo Roberto Schwingel,\u00a0 estudos realizados pelo Comit\u00ea indicam que o potencial h\u00eddrico do Rio Cambori\u00fa, sem a constru\u00e7\u00e3o de \u00e1rea de reserva\u00e7\u00e3o, \u00e9 suficiente para garantir o abastecimento somente at\u00e9 2027. De acordo com o presidente do Comit\u00ea, Gilmar Pedro Capelari, pequenas atitudes individuais tamb\u00e9m ajudariam a reduzir o consumo de \u00e1gua.<\/p>\n<p>Em Balne\u00e1rio Cambori\u00fa o consumo m\u00e9dio di\u00e1rio por pessoa \u00e9 de 300 litros de \u00e1gua. Em Cambori\u00fa esse n\u00famero varia de 130 a 150 litros por pessoa. Segundo a ONU (Organiza\u00e7\u00e3o das Na\u00e7\u00f5es Unidas), 110 litros de \u00e1gua por dia \u00e9 suficiente para atender as necessidade b\u00e1sicas do ser humano. A constru\u00e7\u00e3o do parque tem um custo estimado em R$ 100 milh\u00f5es, j\u00e1 considerando os valores a serem pagos com indeniza\u00e7\u00f5es.<\/p>\n<p>O Parque Inund\u00e1vel ser\u00e1 de responsabilidade da Empresa Municipal de \u00c1gua e Saneamento de Balne\u00e1rio Cambori\u00fa (Emasa). O local ter\u00e1 capacidade para armazenar de 2 a 3 bilh\u00f5es de litros de \u00e1gua bruta para serem usadas quando necess\u00e1rio.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-9747\" src=\"http:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-1024x768.jpeg\" alt=\"\" width=\"649\" height=\"487\" srcset=\"https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-1024x768.jpeg 1024w, https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-300x225.jpeg 300w, https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-768x576.jpeg 768w, https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-600x450.jpeg 600w, https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1-250x188.jpeg 250w, https:\/\/www.cdlbc.com.br\/portal\/wp-content\/uploads\/2018\/06\/WhatsApp-Image-2018-06-29-at-9.21.15-AM-1.jpeg 1280w\" sizes=\"auto, (max-width: 649px) 100vw, 649px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A diretoria do Comit\u00ea da Bacia Hidrogr\u00e1fica do Rio Cambori\u00fa defendeu hoje, dia 29 de julho, a import\u00e2ncia da cria\u00e7\u00e3o do Parque Inund\u00e1vel para garantir o abastecimento de \u00e1gua das cidades de Cambori\u00fa e Balne\u00e1rio Cambori\u00fa. O Parque Inund\u00e1vel multiuso tem com objetivo regularizar a vaz\u00e3o do Rio Cambori\u00fa e conter cheias nas \u00e1reas ribeirinhas. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9744,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,5],"tags":[],"class_list":["post-9743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-destaque","category-noticias"],"_links":{"self":[{"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/posts\/9743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/comments?post=9743"}],"version-history":[{"count":4,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/posts\/9743\/revisions"}],"predecessor-version":[{"id":9754,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/posts\/9743\/revisions\/9754"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/media\/9744"}],"wp:attachment":[{"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/media?parent=9743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/categories?post=9743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cdlbc.com.br\/portal\/wp-json\/wp\/v2\/tags?post=9743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}